Experience List
Krendan Gas Facilities
| Job No |
: 306 |
| Location |
: Krendan |
| Service |
: Chemical Injection
Package |
| Qty |
: 1 Ea |
| Owner |
: PT. Salamander Energy Bangkanai, PTE, LTD |
| Contractor |
: PT. Meindo Elang Indah |
| Vendor |
: PT. Cakra Inno
Engineering |
Chemical Injection Package
| Manufacturer |
: CheckPoint |
| Type |
: Electric Pump (Plunger) |
| Standart |
: API 675 |
| Model |
: E Series |
| Control |
: Stroke Length Adjustment |
| Stroke |
: 0-0.6” (0-15mm) |
| Max. Rod Load |
: 450 lb (2kN) |
| Capacity |
: 0.0 – 53.33 USG/H |
| Max. Pressure |
: 12000 PsiG |
| Material |
: SS.316L |
Description :
| Working Capacity |
: 280 Liter |
| Normal Capacity |
: 250 Liter |
| Design Pressure |
: ATM + Full of Water |
| Design Temperature |
: AMB |
| Material |
: SS.316L |