Experience List
Krendan Gas Facilities
Job No |
: 306 |
Location |
: Krendan |
Service |
: Chemical Injection
Package |
Qty |
: 1 Ea |
Owner |
: PT. Salamander Energy Bangkanai, PTE, LTD |
Contractor |
: PT. Meindo Elang Indah |
Vendor |
: PT. Cakra Inno
Engineering |
Chemical Injection Package
Manufacturer |
: CheckPoint |
Type |
: Electric Pump (Plunger) |
Standart |
: API 675 |
Model |
: E Series |
Control |
: Stroke Length Adjustment |
Stroke |
: 0-0.6” (0-15mm) |
Max. Rod Load |
: 450 lb (2kN) |
Capacity |
: 0.0 – 53.33 USG/H |
Max. Pressure |
: 12000 PsiG |
Material |
: SS.316L |
Description :
Working Capacity |
: 280 Liter |
Normal Capacity |
: 250 Liter |
Design Pressure |
: ATM + Full of Water |
Design Temperature |
: AMB |
Material |
: SS.316L |